DHA certification timeline in Kenya: how long each step takes and where applications stall
The short answer
The Digital Health Agency now publishes certification as thirteen stops, from the first form to a certified system live in a facility. The certificate is stop eleven. Two national validations come before it and two facility steps come after it.
The Agency's FAQ states that most applications reach a certification decision within 20 to 30 days of the applicant submitting their last mandatory document. Its regulatory guide publishes a standard turnaround time for each step, and most of those steps are the vendor's own. The useful question for a facility is therefore not "how long does certification take" but "which stop is this application at, since when, and who is holding it".
For the wider picture, including how systems are scored and how to verify a certificate, read the main guide to DHA certification in Kenya.
What the 20 to 30 days measures
The FAQ figure has a precise starting point. The clock is measured from the day the applicant submits its last mandatory document, not from the day the application was created, because the Agency cannot begin its review until the evidence is complete. Applications with complete documentation and systems that meet all requirements sit at the shorter end of the range.
That has two consequences. First, the time a vendor spends completing the self-attestation and gathering evidence is outside the figure entirely, and it can be the longest part of the journey. Second, the figure ends at the certification decision. Facility go-live approval and going live come after it and are not counted.
So when a vendor quotes a timeline, ask which clock they mean. "We applied in July" and "our last mandatory document went in last week" describe very different positions.
The thirteen stops and who holds each one
The Agency colour-codes each stop by who is holding the application: the vendor, DHA, the laboratory or the national validation teams.
- Self-attestation (vendor). Seven sections covering the organisation, how the system is classified, what it does clinically, what it reports, how it secures data, how it exchanges information and the vendor's own assessment of its gaps. It can be saved and resumed.
- Pay and submit (vendor). The declaration is signed electronically and the application fee paid by mobile money. On submission the attestation is scored, critical gaps are identified and a document checklist is generated from the vendor's own answers.
- Upload evidence (vendor). Company and tax records, security policies, penetration-testing and vulnerability reports and proof of each attested claim. Every mandatory item must be in before the application can go to review.
- Document review (DHA). A reviewer verifies each document against what was attested and may raise clarifications.
- API endpoint upload (vendor). The vendor registers the system the laboratory will test, inside a default 20-day window.
- Pay the lab testing fee (vendor). The Agency assigns the system a category and raises the second and final fee against it.
- Conformance testing (laboratory). An independent accredited laboratory runs test cases generated from the vendor's own attestation claims.
- HIE integration validation (validation team). The system is tried against the national health information exchange: the national registries for patient, facility and practitioner, the national terminology and the shared health record.
- SHA claims validation (validation team). The system is run end to end against SHA in the order a facility would use it: member eligibility, patient consent, interventions given, pricing and claim submission.
- Testing result (DHA). The laboratory releases its report and the Agency decides: full certification, conditional certification, re-testing or rejection.
- Certificate issued (DHA). The certificate is digitally signed and published on the public register.
- Facility go-live approval (DHA). A separate permission for each facility.
- Go live (vendor). The deployment is validated, the provider portal is closed off and the facility begins working on the certified system.
The full description of each stop is on the Agency's certification portal.
Standard turnaround times
The regulatory guide sets out the time each step should take and who it is waiting on. Where a step belongs to DHA or the laboratory, the Agency describes the time as what it holds itself to.
| # | Stage | Responsible | Standard time |
|---|---|---|---|
| 1 | Application submission | System vendor or owner | 1 day |
| 2 | Self-attestation | System vendor or owner | 1 day |
| 3 | Application fee payment | System vendor or owner | 1 hour |
| 4 | Document upload | System vendor or owner | 1 day |
| 5 | Document review | DHA | 1 day |
| 6 | Upload of artifacts | System vendor or owner | 1 day |
| 7 | Payment of testing fee | System vendor or owner | 1 day |
| 8 | Testing | Testing laboratory | 2 days |
| 9 | Certification decision | DHA | 20 minutes |
| 10 | Issuance of certificate | Standards and Certification Directorate | 20 minutes |
| 11 | Appeal | System vendor or owner | 5 working days |
| 12 | Appeal application review | DHA | Within 14 days |
Read the table with three points in mind. It uses slightly different stage names from the thirteen stops, so "upload of artifacts" corresponds to the API endpoint upload. It does not give a standard time for HIE integration validation, SHA claims validation, facility go-live approval or going live, so no published figure covers those steps. And it describes the time a step should take once it starts, not the time an application waits before it starts.
Add up the steps the Agency and the laboratory hold and the total is a few days. The 20 to 30 days in the FAQ is longer than that, which tells you that most elapsed time is spent waiting: for a document, for an answer to a clarification, for an endpoint, for a payment or for a laboratory slot.
Where applications stall
Each application's own card on the public tracker shows when each of its stages started and ended. When we checked on 4 November 2026, more applications were sitting at document upload and under document review than at any later stage. The stalls below follow from how the Agency describes each step.
Evidence and document review
This is where most waiting happens, and it is a paperwork problem rather than a software problem.
- Nothing moves until every mandatory item is in. The application cannot be submitted for review with a mandatory document missing. Documents are uploaded as PDF, up to 2 MB each.
- Four requirements block submission outright. ODPC registration, a completed Data Protection Impact Assessment, encryption at rest and encryption in transit. No score compensates for a missing one.
- The checklist grows with the claims. The document checklist is generated from the vendor's own attestation, so every capability claimed needs evidence. Claiming more than the system does creates more evidence to find, not a better score.
- Clarifications stop the clock. A reviewer can raise a clarification on any document, and the clock pauses until the vendor answers. Every mandatory document must be verified before the application moves on.
- Statutory documents come first. Organisations supply a certificate of incorporation, a tax registration certificate and a valid tax compliance certificate with its expiry date. Check that each is current and that the company name matches across every document before uploading.
The API endpoint upload window
Once documents pass, the vendor registers the system the laboratory will actually test: a base URL, an endpoint or supporting document for every generated test case, and signed declarations that the endpoints are accurate and that the vendor consents to security testing. The Agency gives a 20-day window by default.
The test cases are generated from the attestation, so a vendor that claimed broadly needs an endpoint or a supporting document for every one of those claims. A vendor without a stable environment the laboratory can reach will feel this step. Nothing is charged and nothing is dispatched to the laboratory until it is ready.
The lab testing fee
When the environment is ready, the Agency assigns the system a category and raises the lab testing fee against it. The Agency states that a mobile health app and a hospital-wide records system are not tested to the same depth, which is why the fee follows the category. Larger fees may be settled in two instalments.
The rule that matters for time is simple: nothing is booked until the fee is paid. Any delay in agreeing the category, approving the payment internally or settling it is a day-for-day delay to laboratory testing. The amount is shown in the certification portal before payment is requested.
Testing and the national validations
The laboratory runs test cases generated from the attestation and records results, evidence and any non-conformances case by case. It cannot release a report until every test case has been executed. The HIE integration and SHA claims validations then follow before any certificate is issued, and the Agency publishes no standard time for either.
Systems certified before these two validations became part of certification still have them ahead of them. The Agency states that the tracker names the validations not yet reported for each such system.
Decisions, re-testing and appeals
At the testing result the Agency decides one of four outcomes: full certification, conditional certification, re-testing or rejection. Full certification runs two years and conditional certification runs one. The FAQ states that recertification is required every two years.
A system that fails a required criterion receives detailed feedback on non-conformities, gets a remediation period and may resubmit, and additional testing fees may apply for re-evaluation. A rejection can be appealed. The regulatory guide gives the vendor five working days to appeal and the Agency up to 14 days to review it.
After the certificate: go-live approval
A certificate confirms the system met the standard under test. Putting it in front of patients at a particular facility is a separate permission, granted for that facility, and the Agency states it is not granted until three things have happened:
- Facility acknowledgement.
- SHA acknowledgement.
- Production credentials issued.
All three are required before production access is granted. Going live then involves SHA validation, the closure of the provider portal for that facility and the facility starting work on the certified system.
No standard time is published for either step, so plan go-live as its own piece of work. A facility that waits for the certificate before starting its acknowledgement with SHA and its vendor has added that time to the end of the journey rather than running it alongside.
What to ask a vendor at each point
An application, a test booking or a remediation plan is progress through the process. It is not a certification decision. These questions turn "nearly certified" into something you can check.
- Before the last mandatory document: which mandatory items are still outstanding, and when will they be in?
- In document review: are there open clarifications, and on what?
- At API endpoint upload: how many days of the window remain, and is the test environment ready?
- At the lab testing fee: what category has been assigned, and has the fee been paid?
- In testing or validation: has the laboratory been booked, and have the HIE integration and SHA claims validations been reported?
- After a decision: what is the certificate number, is it full or conditional and when does it expire? Check it on the public register or the certificate verification tool.
- Before go-live: have facility acknowledgement, SHA acknowledgement and production credentials been completed for this facility?
Any of these can be checked against the application's card on the public tracker. The standalone guide to checking whether a health system is really DHA certified covers the certificate checks in more detail.
Common questions
- How long does DHA certification take?
- The Agency's FAQ states that most applications reach a certification decision within 20 to 30 days of the applicant submitting their last mandatory document. The clock runs from that submission, not from the day the application was created, so the time a vendor spends gathering evidence comes before it.
- What are the DHA certification steps?
- The Agency publishes thirteen stops: self-attestation, pay and submit, upload evidence, document review, API endpoint upload, pay the lab testing fee, conformance testing, HIE integration validation, SHA claims validation, testing result, certificate issued, facility go-live approval and go live.
- Where do DHA applications usually stall?
- In the early stops, and mostly on the vendor's side. An application cannot reach review until every mandatory document is in, reviewer clarifications pause the clock, the API endpoint upload has a default 20-day window and the laboratory is not booked until the lab testing fee is paid.
- Is a DHA certificate permission to go live?
- No. Go-live at a facility is a separate approval for that facility. The Agency states it needs facility acknowledgement, SHA acknowledgement and production credentials before production access is granted.
- Does being on the DHA tracker mean a system is certified?
- No. The public tracker lists every organisation from the moment it starts its self-attestation. The Agency states that an application in progress is not a certification. Only systems issued a certificate appear on the public register.
- Does Nanto Health claim DHA certification?
- No. Nanto Health does not currently claim DHA certification. It is a dialysis-specific EMR and SHA claim-readiness platform, not a general hospital-wide HMIS.
Where Nanto Health fits
Nanto Health is a dialysis-focused electronic medical record and SHA claim-readiness platform for Kenyan facilities. It is built around the outpatient renal workflow rather than as a hospital-wide system. Nanto Health does not currently claim DHA certification.
The go-live step matters for SHA work in particular. Nanto Health helps a dialysis team prepare, validate and track the record behind a claim. Direct electronic submission remains gated by onboarding, testing, certification and production credentials. See SHA claim readiness, DHA reporting requirements and EMR vs HMIS in Kenya for the scope question that decides what a system is certified for. Request a demo to walk through your facility's workflow.
Sources
Sources checked live on 4 November 2026: the Digital Health Agency certification portal and its description of the thirteen stops, fees and submission blockers, the regulatory guide and its standard turnaround times, the certification FAQ, the application tracker, the public register and the signed certification framework. The questions to ask a vendor are editorial buyer guidance, not additional DHA requirements. These sources change. Confirm current requirements with the Agency before relying on any time or step here.