Nanto Health

Nanto Health blog

DHA certification in Kenya: a practical guide for facilities and system vendors

The short answer

DHA certification is the Digital Health Agency's assessment of a digital health system against national requirements before that system is deployed in a Kenyan healthcare facility. The Agency states on its certification portal that certification is mandatory for all digital health systems deployed in public and private healthcare facilities.

Certification attaches to the system and to the scope it is certified for, not to the facility. A facility does not sit the assessment. A facility chooses a system, and then carries the consequence of that choice. That is why the practical question for a facility manager is not "how do I get certified" but "can my vendor show me where their system stands, and can I verify it independently".

Where the requirement comes from

The Digital Health Act, 2023 established the Digital Health Agency as the national body responsible for digital health systems, including the certification of health information systems and the national health information exchange. The Health Information Management Procedures Regulations, 2025 set the standards, the assessment criteria and the ongoing obligations that follow certification.

The operating position published by the Agency is straightforward. Systems that hold health data or connect to national infrastructure are expected to be certified, and certification carries continuing duties rather than a one-off approval.

For the practical buyer check, use the standalone guide to checking whether a health system is really DHA certified. It shows what to ask for, what the certificate lookup can establish and why readiness language is not certification.

Which systems need certification

The Agency's published category list covers most of what a facility runs:

  • Electronic medical record systems that hold patient records and clinical documentation.
  • Health information systems and hospital-wide management systems covering administrative, financial and clinical operations.
  • Laboratory information systems.
  • Pharmacy and medication management systems.
  • Imaging and diagnostic systems, including PACS and radiology information systems.
  • Digital health platforms and applications, including telehealth and patient engagement tools.

A system is assessed against what it declares. A renal or outpatient system is not assessed as though it were a hospital-wide platform, and a vendor should not be describing capability it did not declare. Read the category list on the Agency's system categories page.

How a system is scored: four weighted domains

The self-attestation produces a readiness score across four areas, and the applicant sees it before submitting, along with any critical gaps. The Agency publishes the weights on its certification portal:

  1. Functionality, 35 per cent. Clinical and operational capability: orders, medication, decision support and summaries.
  2. Security, privacy and confidentiality, 30 per cent. Data protection, encryption, authentication, audit trail, backup and integrity.
  3. Reporting and public health alerts, 20 per cent. Notifiable diseases, IDSR weekly reporting, public health events and routine returns.
  4. Information exchange and interoperability, 15 per cent. Kenya HIE readiness, FHIR and HL7, and terminology standards.

A good score is not enough on its own. Four technical requirements block submission outright, however complete the rest of the attestation is: registration with the Office of the Data Protection Commissioner, a completed Data Protection Impact Assessment, encryption at rest and encryption in transit. Within security, the Agency states that data protection and encryption earn no marks for simply being switched on and are scored on what the applicant can evidence. The signed Kenya Digital Health Certification Framework sorts specifications into mandatory, recommended and optional sets.

Reporting is worth testing for buyers. At 20 per cent it sits between security and interoperability. The standalone guide to DHA reporting requirements and public health alerts turns that domain into questions a vendor should demonstrate.

The thirteen-stop process

The Agency now publishes the journey as thirteen stops, from the first form to a certified system live in a facility, each marked by who is holding the application at that point. The certificate is stop eleven, not the last one:

  1. Self-attestation (vendor). Seven sections covering the organisation, how the system is classified, what it does clinically, what it reports, how it secures data, how it exchanges information and the vendor's own assessment of its gaps.
  2. Pay and submit (vendor). The declaration is signed electronically and the application fee paid. On submission the attestation is scored and a document checklist is generated from the vendor's own answers.
  3. Upload evidence (vendor). Company and tax records, security policies, penetration-testing and vulnerability reports and proof of each attested claim. The application cannot go to review until every mandatory item is in.
  4. Document review (DHA). A reviewer checks each document against what was attested. Clarifications pause the clock until the vendor answers.
  5. API endpoint upload (vendor). The vendor registers the system the laboratory will test, with signed declarations, inside a default 20-day window.
  6. Pay the lab testing fee (vendor). The Agency assigns the system a category and raises the second and final fee against it. Nothing is booked until it is paid.
  7. Conformance testing (laboratory). An independent accredited laboratory runs test cases generated from the vendor's own attestation claims.
  8. HIE integration validation (validation team). The system is tried against the national health information exchange, its registries, its terminology and the shared health record.
  9. SHA claims validation (validation team). The system is run end to end against SHA: eligibility, consent, interventions, pricing and claim submission.
  10. Testing result (DHA). With the laboratory report and both national validations, the Agency decides: full certification, conditional certification, re-testing or rejection. A rejection can be appealed.
  11. Certificate issued (DHA). The certificate is digitally signed and published on the public register.
  12. Facility go-live approval (DHA). A separate permission for each facility, covered in the next section.
  13. Go live (vendor). The deployment is validated, the provider portal is closed off and the facility starts working on the certified system.

Most of the waiting is in the early stops, and most of it is paperwork rather than software. An application cannot reach review with a mandatory document missing, and every clarification a reviewer raises stops the clock until it is answered. The full process, live on the Agency's certification portal, describes each stop in more detail.

A certificate is not go-live

A certificate confirms that the system met the standard under test. Putting it in front of patients at a particular facility is a separate permission, granted for that facility, and the Agency states it is not granted until three things have happened: facility acknowledgement, SHA acknowledgement and the issue of production credentials. All three are required before production access is granted. Going live then validates the deployment and closes the provider portal for that facility.

For a facility, that means two dates matter, not one: when the vendor was certified, and when this facility's go-live approval was granted. Plan the second as its own piece of work with your vendor and with SHA, rather than assuming it follows the certificate automatically.

Timelines, remediation and recertification

The Agency's FAQ states that most applications reach a certification decision within 20 to 30 days of the applicant submitting their last mandatory document. The clock is measured from that submission, not from the day the application was created, and applications with complete documentation sit at the shorter end. Its regulatory guide also publishes a standard turnaround time for each step, for example one day for document review, two days for laboratory testing and 20 minutes each for the certification decision and the issue of the certificate. Most of the steps are the vendor's own. An appeal must be filed within five working days and the Agency reviews it within 14 days.

A system that fails a required criterion receives detailed feedback on non-conformities, gets a remediation period and may resubmit, with additional testing fees possible on re-evaluation.

Certification is not permanent. Full certification runs two years and conditional certification runs one. The FAQ states that recertification is required every two years and that significant system changes may trigger an interim review. The Agency also runs periodic surveillance audits, which can include remote assessment, documentation review and occasional site visits.

For a facility, the practical consequence is that "our vendor is certified" is a statement with a date attached. Ask when, for what scope and when it next expires.

What the interoperability assessment actually checks

The interoperability domain is the most deterministic part of the assessment, because it is machine-checked rather than judged.

Conformance is measured against Kenya's core FHIR implementation guide and its domain-specific children, covering areas such as claims, prescriptions, clinical summaries and referrals. Validation runs in three layers: syntax, meaning structure, cardinality and data types; semantics, meaning clinical sense and referential integrity, so a claim that references no patient fails; and terminology, meaning code values are checked against the Kenya National Health Terminology Service.

Two details matter to anyone preparing. A payload declares the profile it claims to support, and the system is tested against the profiles it claims rather than everything in the guide. And the validation output is the standard HL7 validator error log, which means failures are self-diagnosable before anyone else sees them. A vendor that cannot run that validation against its own output before formal testing is discovering its failures in the worst possible place. How DHA tests interoperability walks through the published guides and the validator command itself.

The developer material sits at the Agency's AfyaConnect developer portal and the health information exchange documentation. Both change, so pin the version you tested against and record it.

Cloud hosting and data residency

Cloud-hosted systems can be certified. The Agency states that they must meet security, data residency and compliance requirements, and that additional considerations apply to cloud deployments including data sovereignty and hosting location verification.

This is the least settled area in practice, and it is worth being precise about what is unresolved rather than guessing. The questions a buyer or a vendor should be putting in writing are: which jurisdictions are acceptable, what document is accepted as residency evidence, whether the requirement extends to backups, replicas and disaster-recovery copies or only to the primary store, and whether a hosting change after certification is a notification, a reassessment or a fresh certification.

Do not make an infrastructure decision on a verbal answer. Ask the Agency in writing and keep the reply.

What the deadline talk means

A September 2026 compliance date has circulated widely among facilities and vendors, and a good deal of anxiety with it. Two things are worth separating.

The date is real as policy, and the Agency has been consistent that it is not the Agency's to move. But the Agency has also described certification as a continuing process rather than a shutter that comes down, and the practical currency is demonstrated progress rather than a finish line reached on a particular morning.

For a facility, that translates into one question for your vendor: can you show me that you have applied, where you are in the process and what is outstanding. An application that has not been filed at all is a different risk from one sitting in document review. Confirm the current position with the Agency at certification.dha.go.ke rather than relying on second-hand accounts, including this one.

How to verify a certification claim

This is the section to act on. Vendor claims in this market have been running ahead of the paperwork, and the Agency has publicly denied that any communication named a limited set of permitted systems.

  • Search the Agency's public register of certified systems. It lists each certified system with its organisation, category, certificate number, status, issue date and expiry date.
  • Check the certificate number in the Agency's certificate verification tool, not the vendor's brochure. Certificate numbers take the form CERT-YYYY-XXXXXXXX, and the tool also accepts the signature serial from the signed PDF.
  • Do not read the public application tracker as a list of certified systems. The Agency states plainly that an application in progress is not a certification.
  • For a system certified before HIE integration validation and SHA claims validation became part of certification, ask whether both have since been completed. The Agency states those systems still have the two validations ahead of them, and the tracker names any validation not yet reported.
  • Treat "HIE compliant", "integration ready" and "in final stages" as marketing language. None of them is certification.
  • Ask for the certificate number, the certified scope and the expiry date in writing. A certified vendor can supply all three in a sentence.
  • Where a vendor is still in the process, ask which stage and what is outstanding. An honest answer to that is more informative than a confident claim.

Ten questions to put to your system vendor

  1. Have you applied for DHA certification, and what stage is the application at today?
  2. What scope have you declared, and does it cover the services this facility actually runs?
  3. Which of the four domains are you weakest in, and what are you doing about it?
  4. Can you show reporting and public health alerting working, not just described?
  5. Which FHIR implementation guide version do you validate against, and can you show a clean validator run?
  6. Where is our data hosted, and what residency evidence do you hold?
  7. Who is your named data protection officer, are you registered with the Office of the Data Protection Commissioner and can you separate ODPC evidence from DHA certification evidence?
  8. What happens to our records if we leave you, and in what format do we get them?
  9. If your certification lapses or a change triggers reassessment, what is your plan and who bears the cost?
  10. What is your written support channel and response time when something breaks during a claim cycle?

What is not yet published

Being straight about the gaps is more useful than pretending they are closed. When this guide was first written in August 2026, there was no public register, no FAQ set and no published turnaround commitment. The Agency has since published all three: a public register, a certification FAQ and standard turnaround times in its regulatory guide. Other things vendors reasonably want, such as a versioned implementation guide package, a test-scenario pack with pass and fail criteria and a settled written standard for data residency evidence, are worth checking for on the Agency's site before you assume they are still missing.

If you are a facility, that is not your problem to solve. It is a reason to ask your vendor for evidence rather than assurance.

Common questions

Is DHA certification mandatory in Kenya?
Yes. The Digital Health Agency states that certification is mandatory for all digital health systems deployed in public and private healthcare facilities.
Who is certified, the facility or the software vendor?
The system is certified, for the scope it declares. A facility does not sit the assessment. It chooses a system and carries the consequence of that choice, which is why verifying the vendor's position matters.
What does DHA assess?
Four weighted domains: functionality at 35 per cent; security, privacy and confidentiality at 30 per cent; reporting and public health alerts at 20 per cent; and information exchange and interoperability at 15 per cent. Four technical requirements block submission outright whatever the score: ODPC registration, a completed Data Protection Impact Assessment, encryption at rest and encryption in transit.
How long does DHA certification take?
The Agency's FAQ states that most applications reach a certification decision within 20 to 30 days of the applicant submitting their last mandatory document. The clock runs from that submission, not from the day the application was created. The Agency also publishes a standard turnaround time for each step, and most of those steps are the vendor's own.
How do I check whether a system is actually DHA certified?
Search the Agency's public register of certified systems, or enter the certificate number in its certificate verification tool. Certificate numbers take the form CERT-YYYY-XXXXXXXX. The register shows the system, the organisation, the category, the certificate number, its status and its issue and expiry dates. An application on the public tracker is not a certification. Claims such as HIE compliant or integration ready are not certification either.
Does DHA certification expire?
Yes. Full certification runs two years and conditional certification runs one. The Agency's FAQ states that recertification is required every two years, that significant system changes may trigger an interim review and that the Agency runs periodic surveillance audits.
Is a DHA certificate permission to go live at a facility?
No. A certificate confirms the system met the standard under test. Go-live at a particular facility is a separate approval, granted only after facility acknowledgement, SHA acknowledgement and the issue of production credentials. Going live then closes the provider portal for that facility.
Can a cloud-hosted system be certified?
Yes. The Agency states that cloud-hosted systems can be certified provided they meet security, data residency and compliance requirements, with additional considerations for data sovereignty and hosting location verification.

Where Nanto Health fits

Nanto Health is a dialysis-focused electronic medical record and SHA claim-readiness platform for Kenyan facilities. It is built around the outpatient renal workflow rather than as a hospital-wide system, which is a deliberate scope choice and the same choice that shapes how it is assessed.

Nanto Health does not currently claim DHA certification. We publish this guide because facilities are being asked to make a system decision under time pressure with incomplete public information, and a buyer who knows how to verify a claim is better off regardless of which system they choose.

For related reading, see the DHA certification timeline guide for standard times and where applications stall, EMR vs HMIS in Kenya for the scope distinction that determines what a system is certified for, what an HMIS actually covers, and SHA dialysis claims in Kenya for the record a claim has to stand on. The ODPC and DHA obligations guide separates data-protection registration, DPIA work and certification evidence. The declared scope guide explains how to read a certificate's category against the system you are buying. The dialysis EMR and SHA claim-readiness pages describe the scope Nanto Health is built for, and security and accountability covers the controls behind the security and privacy domain. Request a demo to walk through your facility's workflow.

Sources

This guide was first written against the Digital Health Agency's published certification material on 21 August 2026, together with the Agency's vendor sensitization session held that day. Sources checked live on 4 November 2026: the certification portal and its process description, the regulatory guide and its standard turnaround times, the certification FAQ, the public register, the system categories and the signed certification framework. The Agency's former process and framework pages no longer load, so this guide links to the pages that replaced them. Points drawn from that session are described as the Agency's stated position and are not a substitute for written guidance. These sources change. Confirm current requirements at dha.go.ke before relying on any figure or date here.

This article is general operational information. It is not legal, clinical or reimbursement advice. Confirm current requirements with SHA, DHA and your professional advisers.